| History | |
|---|---|
| Name | Raimondo Montecuccoli | 
| Namesake | Raimondo Montecuccoli | 
| Ordered | 2014 | 
| Builder | Fincantieri, Muggiano | 
| Cost | €0.5 billion | 
| Laid down | 8 November 2018 | 
| Launched | 13 March 2021 | 
| Commissioned | 27 September 2023 | 
| Identification | Pennant number: P432 | 
| Status | Active | 
| General characteristics | |
| Class and type | Thaon di Revel-class offshore patrol vessel | 
| Displacement | |
| Length | |
| Beam | 16.5 m (54 ft 2 in) | 
| Draught | 10.5 m (34 ft 5 in) | 
| Depth | 5 m (16 ft 5 in) | 
| Propulsion | 
  | 
| Speed | 
  | 
| Range | 5,000 nmi (9,300 km; 5,800 mi) at 15 knots (28 km/h; 17 mph) | 
| Complement | 173 beds (+ 30 on modular rear zone) | 
| Crew | PPA Full 120 crew;PPA Light+ + 90;PPA Light 90;( add 24 crew for two helos on board and other 89/59 beds for optional boarding team, marines team, maritime command staffs, etc.) | 
| Sensors and  processing systems  | 
  | 
| Electronic warfare  & decoys  | 
  | 
| Armament | 
  | 
| Aircraft carried | |
| Aviation facilities | 
  | 
Raimondo Montecuccoli (P432) is the third ship of Paolo Thaon di Revel-class offshore patrol vessel.
Development and design
Italian Navy ordered the new MBDA TESEO MK/2E heavy-duty missile (TESEO "EVO"), a long-range anti-ship missilewith also strategic land attack capability. The missile will have a new terminal "head" with dual RF seeker (Radio Frequency) and, presumably, date the need to even attack ground targets, IIR (Imaging IR). Compared to the predecessor OTOMAT/TESEO, the TESEO "EVO" MK/2E has a double range or more than 360 km. Former OTOMAT is accredited for a range of action of more than 180 km.[1][2][3]
Construction and career
Raimondo Montecuccoli was laid down on 8 November 2018 at Fincantieri Muggiano and was launched on 13 March 2021.[4][5] She had been expected to be commissioned in January 2023.
References
- ↑ "Un nuovo TESEO land attack per la Marina - RID Portale Difesa". Archived from the original on 14 July 2018. Retrieved 3 November 2020.
 - ↑ "Airpressonline.it".
 - ↑ "Mbda, al via lo sviluppo del nuovo Teseo". 22 March 2018.
 - ↑ "Keel Laying Ceremony for the third PPA Vessel | OCCAR". www.occar.int. Retrieved 15 March 2021.
 - ↑ Vavasseur, Xavier (13 March 2021). "Italian Navy's third PPA "Raimondo Montecuccoli" launched by Fincantieri". Naval News. Retrieved 15 March 2021.
 
External links
- Pattugliatori Polivalenti di Altura Marina Militare website